197 Stoddard Road is a strong example of SLINE's wider delivery capability. SLINE was responsible for multiple connected stages of the redevelopment, including asbestos removal, demolition, earthworks, public drainage, private drainage and plumbing, and All-in-One site works. Bringing these scopes together allowed the project to move from early site clearance through to underground services and site preparation with greater continuity between stages.

Project Challenge

Public drainage within the road corridor

SLINE traffic management and public drainage night works

A major challenge was the public stormwater and wastewater drainage connection, which required work within the public road corridor.

The drainage scope required a Traffic Management Plan (TMP) and careful coordination around public access and traffic requirements.

Critical road works were completed during a restricted night-time working window from 8:00 PM to 4:00 AM, requiring detailed planning between the drainage crew, traffic management and the wider site programme.

Project Delivery

Multiple specialist stages delivered by SLINE

The project progressed through asbestos removal, demolition and site clearance into earthworks, public drainage, private drainage and plumbing, and wider All-in-One site-service works.

Because these scopes were delivered through SLINE's own wider team, the handover from one stage to the next could be planned around the same site conditions, access requirements and overall programme.

The result was a coordinated full-service project rather than a series of disconnected single-trade packages.

Project Stages

The project moved through several connected work stages, with SLINE responsible for the wider sequence rather than one isolated trade.

SLINE asbestos containment work

Stage 01

Asbestos Removal

Hazardous-material work was completed before later demolition and civil stages could progress.

SLINE demolition and site clearance

Stage 02

Demolition

Demolition and clearance prepared the property for the ground and infrastructure work that followed.

SLINE earthworks and underground trenching

Stage 03

Earthworks

Excavation and trenching formed the transition from site clearance into drainage and service installation.

SLINE public drainage excavation

Stage 04

Public Drainage

Public stormwater and wastewater connections formed a major civil component of the redevelopment.

SLINE traffic management and drainage night works

Stage 05

Traffic Management & Night Works

Road-corridor drainage activity was coordinated under a TMP and completed within restricted night-time working hours.

All-in-One Scope

Public drainage · Private drainage & plumbing · associated site-service works

Project Outcome

SLINE completed the connected scope from early hazardous-material and demolition work through to earthworks, drainage, plumbing and All-in-One site servicing.

197 Stoddard Road demonstrates the company's ability to deliver a complex project involving several specialist crews, public infrastructure, traffic management and restricted working hours while keeping the different stages connected.